Key Highlights

● Equinox Gold reported a Musselwhite intersection of 22.9 metres at 10.00 g/t gold, with estimated true width of 21.1 metres.

● The 2026 global exploration budget is approximately US$155 million, covering about 477,000 metres of planned drilling across nine projects.

● At Valentine, the company reports 68,890 metres drilled in 2026 and says Minotaur mineralization has strike length exceeding one kilometre.

● Greenstone drilling began on August 14 and is expected to reach four rigs by October, with assays pending.

Equinox Gold Corp. (NYSE American:EQX) furnished a Form 6-K to the U.S. Securities and Exchange Commission on September 29, 2026, attaching a press release from Vancouver, British Columbia that updates its 2026 exploration program in Canada. The release headlines continued drilling success along the Musselwhite mine trend in northwestern Ontario and progress on the Minotaur discovery at the Valentine property in Newfoundland and Labrador. Among its results is an intersection at Musselwhite of 22.9 metres grading 10.00 grams per tonne of gold.

The Program and Musselwhite

The company says its 2026 global exploration budget is approximately US$155 million, covering about 477,000 metres of planned drilling across nine projects. Through September, it reports having completed about 308,000 metres with 45 drill rigs operating in Canada, the United States, Mexico and Nicaragua. Of those rigs, 16 were in Canada.

The release describes Musselwhite as a high-grade underground mine with more than 30 years of operation. Equinox reports 59,485 metres drilled there in 2026, split among underground, deep directional surface and near-mine surface programs. The highlighted mine-trend extension hole, 26-NSD01-008W, intersected 22.9 metres at 10.00 g/t gold, with an estimated true width of 21.1 metres. Another hole, 26-NSD02-009W, returned 20.5 metres at 7.31 g/t gold.

Underground drilling included 13.2 metres at 9.55 g/t gold in the Redwings zone and 9.2 metres at 16.96 g/t gold in the Lynx zone. The release also reports a narrow interval of 1.0 metre at 471.00 g/t gold in the PQE zone. The company lists its objectives at Musselwhite as extending the mine trend, converting high-grade underground resources and identifying additional mill feed, and it says it controls about 65,000 hectares in the North Caribou Greenstone Belt.

Valentine and Greenstone

At Valentine, the company reports 68,890 metres drilled in 2026 and highlights results along the mine trend, including 164.0 metres at 2.55 g/t gold at the Marathon Pit. The exploration update also cites 99.4 metres at 0.98 g/t gold. For the Minotaur zone, one reported hole returned 33.2 metres at 1.57 g/t gold. The company says Minotaur mineralization has a strike length exceeding one kilometre and remains open in all directions, and that only 20 percent of Valentine's 327 square kilometre land package has been explored.

At Greenstone, described as its largest Canadian production centre, drilling began on August 14 and is expected to reach four rigs by October. Planned metres include 16,800 for underground extension, 5,040 at the North Pit Wall and 2,520 at South Porphyry. The release says early holes intersected mineralized intervals in targeted horizons but assays are pending.

Management Commentary and Technical Disclosure

The release quotes Jason Simpson, President of Equinox Gold, as saying: "Canada is increasingly becoming the foundation of Equinox Gold's production and organic growth strategy, with greater than 60% of 2026 gold production from Canadian operations." He also said the company believes "our current mine plans capture only part of the Long-term Growth potential across our Canadian portfolio."

Sylvain Guérard, Executive Vice President Exploration, is named as the Qualified Person under National Instrument 43-101. The release explains that Valentine samples are analysed by MSALabs and Musselwhite samples by ALS Canada Inc. or SGS Canada Inc., with standards and blanks inserted as part of quality control. Exploration results are not mineral reserves.

Equinox Reserve Updates Planned for Musselwhite and Greenstone

The company says it plans year-end mineral reserve and resource updates at Musselwhite in the first quarter of 2027, incorporating drilling through July 2026 and including new resources at the PQE zone. Valentine drilling data through July 2026 is also expected to feed its year-end update, with an initial Frank Zone resource estimate described as planned near term. At Greenstone, a mineral resource and reserve update is targeted for year-end 2027, and assay results from the current campaign are still pending.