Key Highlights

  • 0.21 is the consensus EPS estimate for Kolibri Global Energy Inc. (NASDAQ:KGEI), which reports third quarter 2026 results before the market opens on November 13, 2026, with a USD 195.14 million market value.
  • 0.16 is the negative consensus EPS estimate per the screener snapshot for Beam Global (NASDAQ:BEEM), due after the market closes on November 13, 2026, with a USD 16.12 million nano-cap market value.
  • 0.27 is the negative consensus EPS estimate for Anfield Energy Inc. (NASDAQ:AEC), listed after the market closes on November 13, 2026, with a USD 56.76 million small-cap Market Value and a first-half net loss of 16.0 million.
  • 8.5 million is the USD second quarter Net Income of Kolibri, against a 3.08 million net loss at Beam and a 16.0 million first-half loss at Anfield, showing the wide gap in profitability across the group.

Kolibri Global Energy Inc. (NASDAQ:KGEI): Production Low Point Before Four New Wells

Kolibri Global Energy Inc. (NASDAQ:KGEI) is listed to report third quarter 2026 results before the market opens (BMO) on November 13, 2026. Per the screener snapshot, the consensus estimate is EPS of 0.21 and the market Capitalization is USD 195.14 million, the largest of the three companies. The estimate compares with 0.24 basic EPS in the second quarter of 2026 and 0.10 in the third quarter of 2025, when net income was USD 3.59 million on Revenue of USD 15.19 million. Second quarter revenue net of royalties was USD 22.5 million, up 109% from USD 10.8 million, on production of 4,690 barrels of oil equivalent per day, up 46%. Net income was USD 8.5 million versus USD 2.9 million, and adjusted EBITDA was USD 16.4 million. The operating netback was USD 43.92 per barrel of oil equivalent, and second quarter capital expenditures were USD 21.7 million. Management agreed that the third quarter should be the lowest production quarter of 2026, and it expects four wells to add production, mostly contributing a full quarter in the fourth quarter. No numeric production or capital guidance was found. Borrowing capacity is USD 75 million after the May 2026 redetermination, with USD 30.5 million available, USD 43.7 million of non-current borrowings and USD 1.6 million of cash. Working Capital was a Deficit of USD 14.1 million. First half revenue was USD 42.1 million, and the Lovina well is a first test of the False Caney across about 9,900 acres. Risks include dependence on new well results, three wells shut in for about one-third of the second quarter, oil price swings and Credit Facility reliance.

Beam Global (NASDAQ:BEEM): Preliminary Growth and a Terminated Deal

Beam Global (NASDAQ:BEEM) is listed to report third quarter 2026 results after the market closes (AMC) on November 13, 2026. The consensus estimate per the screener snapshot is a loss of USD 0.16 per share, close to the second quarter loss of USD 0.14 per share. The company already released preliminary third quarter figures on October 13, 2026 showing 8% revenue growth; the dollar amount was not found in published coverage. Market capitalization per the screener snapshot is USD 16.12 million, a nano-cap level with high Volatility and liquidity risk. Second quarter revenue of USD 8.562 million rose 21% from USD 7.075 million, and the net loss narrowed to USD 3.08 million from USD 4.278 million. Gross Margin was 17.8% versus 20.3%, and operating expenses fell to USD 4.523 million from USD 5.901 million. No numerical guidance was found; management said margins should improve as volumes return and cost cuts take hold. Manufacturing is moving to Yuma, Arizona, saving about USD 2.7 million of rent. The planned USD 24 million ScoutDI Acquisition was terminated on November 6, 2026, with no fees owed. At June 30, 2026, cash was USD 1.025 million, receivables were USD 6.741 million and Backlog was USD 5.4 million. Gross margin was 17.8% on a GAAP basis and 26.2% non-GAAP, sales outside the US were 47% of revenue, and management flagged pent-up Middle East demand. Receivables were USD 6.741 million and inventory was USD 8.259 million. Equity was USD 20.256 million, with an accumulated deficit of USD 141.581 million, and shares outstanding were 22,267,380. Risks include thin cash, a USD 2.779 million credit-loss allowance and a USD 1.6 million provision tied to one customer.

Anfield Energy Inc. (NASDAQ:AEC): Uranium Permitting and a Thin Cash Base

Anfield Energy Inc. (NASDAQ:AEC) is listed to report third quarter 2026 results on November 13, 2026, after the market closes (AMC). The consensus estimate is a loss of USD 0.27 per share, and the market capitalization per the screener snapshot is USD 56.76 million, which makes this a small-cap stock. That estimate looks large relative to the size of the Business and is presented per the screener snapshot. The latest report covers the six months ended June 30, 2026, with a net loss of 16.0 million, up 126% from 7.1 million a year earlier, and first revenue of 744,766 after the USD 5 million BRS Inc. acquisition closed on May 8, 2026. Management gave no numerical financial guidance. Operationally, a June 2026 preliminary economic assessment pointed to a 106% pre-tax internal rate of return for the combined uranium and vanadium plan, the first blast at the Velvet-Wood mine took place on August 28, 2026, and Utah regulators issued a draft renewed radioactive materials license and draft groundwater discharge permit for the Shootaring Canyon Mill on October 27, 2026, with a restart targeted for 2027. Cash fell to 1.8 million at June 30, 2026, with a working capital deficit of 323,000, before a public offering closed on July 31, 2026 for USD 6.86 million. Debt was not reported in published coverage. The June 2026 economic assessment and the August 28, 2026 first blast are operational milestones rather than revenue. With a market value under USD 100 million, liquidity can be thin and price moves large. Risks include a USD 10 million arbitration claim filed in November 2025, financing and dilution needs and uranium price swings.

Where Things Stand

Where things stand: Kolibri Global Energy Inc. (NASDAQ:KGEI) is the profitable producer of the group, with a 0.21 estimate and USD 8.5 million of second quarter net income. Beam Global (NASDAQ:BEEM) expects a 0.16 loss, has 8% preliminary revenue growth and holds only USD 1.025 million of cash. Anfield Energy Inc. (NASDAQ:AEC) expects a 0.27 loss and is working toward a 2027 mill restart after raising USD 6.86 million. Kolibri and Beam Global differ on timing, since Kolibri reports before the market opens and Beam and Anfield report after the close on November 13, 2026. This article is informational and is not Investment advice.